Performance of design works includes:
Stage “Predesign offers”:
- Working out of the documentation of the preproject.
- Object photo fixing.
- The general explanatory note.
- The general plan.
- Architectural decisions.
- Statement of the draft.
- Constructive decisions.
- Demonstration material of the main architect.
- Preservation of the environment.
- Fire-prevention protection.
- Engineering systems and the equipment.
- Basic schemes of engineering systems.
- Calculation of loadings.
- Technological decisions.
The coordination of the documentation on the preproject stage.
- The coordination with the regional architect (general plan)
- The coordination with the main architect of St. Petersburg.
- The coordination KGIOP.
- The conclusion of Rospotrebnadzor.
- The coordination of the municipal transportation department.
- The coordination of USPH.
- The conclusion of Rostehnadzor.
Stage “Equipment design”.
- Working out of the documentation of the equipment design.
- The general explanatory note.
- General plan:
- The situational plan 1:2000.
- The plan of the organization of relief and road works.
- The plan of an accomplishment and a territory gardening.
- The plan of moving of earthen weights and a balance of excavations.
- The drainage plan.
- Architectural decisions.
- Architectural interiors.
- Constructive decisions.
- Monolithic constructions of frames.
- Metal constructions.
- Technological decisions.
- Heating, ventilation and air-conditioning.
- Heating system by local heating devices.
- Heat supply system. Air-heating screens.
- Ventilation (natural and mechanical).
- Cold supplying system.
- Smoke removal.
- Emergency ventilation after fire.
- Internal water-pipe and a sewerage, drainage, storm collector.
- Cold water supply.
- Hot water supply.
- The fire-prevention water-pipe.
- Storm drains.
- The water drain.
- Power electric equipment, electric lighting.
- The main switchboards.
- Lighting protection and grounding.
- Power networks.
- Internal electric lighting.
- Illumination of facades, illuminated advertisement.
- Electroheating of funnels and storm collectors.
- The system of uninterrupted power supplies.
- Low-current networks.
- System of the fire notification.
- The fire alarm system.
- The security-disturbing alarm system.
- The access monitoring system.
- Video observation system.
- City installation of radio.
- The computer network.
- Installation of telephones.
- Fire-prevention protection.
- The power passport of an object (TSN 23-340-2003)
- Preservation of the environment.
- The building organization
For more detailed information please address to the service department of SMU “Vyborgsky” by telephone 812 3145462 or e-mail info@smu-vyborg.ru

Русский
English
العربية